# Milestone Flow prompt library

Prompts for the off-boarding work and for running Milestone Flow week to week. They work with any capable AI assistant.

## Before you use these

- Use only AI tools your organization has approved for the data involved. Keep sensitive, personal, contractual and export-controlled information out of anything else.
- AI drafts. A named person reviews, decides and is accountable.
- Explain before you accept: whoever approves the output should be able to explain it.
- Replace everything in [square brackets] with your own details.

## Align

### Estimate what planning costs today

> Here is a list of our planning events for the last year, with attendee counts and lengths, and the preparation work we know about: [paste list]. Estimate the total hours per year spent on planning and preparation. Show the calculation as a table, state every assumption, and convert the total to full-time equivalents at [1,880] hours a year. Don't use costs or rates.

### Build a flow baseline from tracker history

> Here is an export of work items finished in the last [12] weeks, with start and finish dates: [paste or attach CSV]. Calculate weekly throughput, and flow time at the 50th and 85th percentiles by item type. List data quality problems you notice, such as missing start dates or items closed in bulk.

### Find framework requirements in policy and contract text

> Read the following text from our [policies / contract / audit requirements]: [paste]. List every clause that names a delivery framework, a framework role, a framework event or a framework measure. For each one, quote it, give its location, and say whether it requires the framework or only refers to it.

### Map the real clocks

> Our organization's important dates for the next 18 months include: [budget cycle, launches, regulatory dates, vendor releases, blackout periods]. Arrange them as a timeline by month, then mark where our current planning increments fall. Point out where the two calendars conflict.

## Design and build

### Draft role guides

> Using the Milestone Flow role description below and our current role [title and duties], draft a one-page role guide with: what this role starts doing, keeps doing and stops doing, what it creates and owns, how it is measured, and a typical week. Plain language, no framework jargon. [paste Milestone Flow role text]

### Sort the backlog into lanes

> Here are our open backlog items with titles, descriptions and any dates: [paste]. Suggest a lane for each: Expedite (outages, security and regulatory findings), Fixed date (tied to a real external date), Standard (ranked business work) or Investment (runway, debt, automation, discovery). Give a one-line reason for each and flag items you are unsure about.

### Turn increment objectives into a milestone register

> Here are our current increment objectives and the commitments behind them: [paste]. Draft a milestone register with columns: milestone, type, owner, baseline date, forecast date, linked objectives. A milestone describes a state we must reach by a date, not a task. Flag objectives that have no real external date.

### Draft decision rights

> Draft a decision-rights table for these decisions: [list]. For each, propose who decides, who is consulted, at which planning level (portfolio, coordination, team) and the usual needed-by lead time. Keep exactly one decider per decision.

## Prove

### Write the weekly flow digest

> Here is this week's tracker data for the pilot teams: [paste]. Write a weekly flow digest of no more than 250 words: blocked items and how long they have been blocked, work older than twice the median flow time, changes in the forecast, and anything that needs a decision. End with a list of exceptions to discuss.

### Draft the quarterly business review pre-read

> Using the milestone register, flow metrics and platform notes below, draft a four-page pre-read for our half-day quarterly business review. Sections: milestone health, flow and delivery trends, proposed lane split, top priorities per platform, risks and decisions needed. Mark every number with its source. [paste inputs]

### Check forecasts against what happened

> Here are last quarter's 85% forecasts and the actual finish dates: [paste]. Calculate the share of items that finished by their forecast date, and explain the biggest misses in plain language. Suggest whether our forecasting inputs need changing.

## Cut over

### Generate the new status report sections

> From the tracker data below, draft the status report sections for milestone health, flow and delivery measures, with a two-sentence plain-language summary of each. Include the previous framework measure alongside for comparison this quarter. [paste data]

### Summarize the staff pulse

> Here are anonymous comments from the six-week staff pulse: [paste]. Group them into themes, count how often each appears, quote one representative comment per theme, and suggest one change the working group could make for each of the top three themes. Don't attempt to identify anyone.

## Stabilize and evolve

### Draft the 90-day review

> Compare the baseline and current figures below for planning hours, flow time, throughput, milestone health and staff pulse: [paste]. Write a one-page before-and-after summary with what improved, what didn't, and three proposed changes for version 2 of our model.

### Find ceremony that no longer earns its keep

> Here is our current list of recurring meetings with purpose, length, attendees and the decisions recorded in the last quarter: [paste]. Identify meetings that produced few or no decisions, and suggest which to shorten, replace with a written digest, or stop.

## Running the model

### Prepare monthly replenishment

> Here are new requests for [platform] since last month: [paste]. Cluster related requests, draft a problem statement and acceptance criteria for each cluster, and check any dates against the milestone register. Don't rank them; ranking is for the business owners.

### Draft an architecture decision record

> Draft an ADR for this decision: [describe]. Include context, at least two options with their trade-offs, a recommended option and the consequences. Mark any assumption I need to verify.

### Explain a forecast to a sponsor

> Our Monte Carlo forecast says [N] items are 85% likely to be done within [W] weeks. Explain what that means in three sentences for a sponsor who doesn't work with forecasts, including what would make it move.


---

*Milestone Flow, milestoneflow.org. Licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Adapt freely; keep this credit.*