  "name": "Milestone Flow tracker model",
  "version": "1.0",
  "license": "CC BY 4.0, milestoneflow.org",
  "lanes": [
    "Expedite",
    "Fixed date",
    "Standard",
    "Investment"
  ],
  "fields": [
    {
      "key": "lane",
      "name": "Lane",
      "kind": "select",
      "options": [
        "Expedite",
        "Fixed date",
        "Standard",
        "Investment"
      ],
      "appliesTo": [
        "feature",
        "story",
        "task",
        "bug",
        "spike",
        "improvement"
      ],
      "description": "Class of service: how this work is treated.",
      "adoRef": "Custom.MFLane",
      "adoSuggested": false
    },
    {
      "key": "platform",
      "name": "Platform",
      "kind": "select",
      "options": [
        "Platform 1",
        "Platform 2",
        "Platform 3"
      ],
      "appliesTo": [
        "investment",
        "feature",
        "story",
        "task",
        "bug",
        "spike",
        "discovery"
      ],
      "description": "Funded product or platform line. Rename the options to your own lines.",
      "adoRef": "Custom.MFPlatform",
      "adoSuggested": true
    },
    {
      "key": "appetite",
      "name": "Appetite",
      "kind": "select",
      "options": [
        "1 week",
        "2 weeks",
        "6 weeks"
      ],
      "appliesTo": [
        "feature",
        "discovery"
      ],
      "description": "Time budget set before work starts. Scope flexes to fit.",
      "adoRef": "Custom.MFAppetite",
      "adoSuggested": false
    },
    {
      "key": "funding",
      "name": "Funding line",
      "kind": "text",
      "options": [],
      "appliesTo": [
        "investment",
        "feature"
      ],
      "description": "Budget or contract line this work traces to.",
      "adoRef": "Custom.MFFundingLine",
      "adoSuggested": false
    },
    {
      "key": "fiscal",
      "name": "Fiscal year",
      "kind": "text",
      "options": [],
      "appliesTo": [
        "investment"
      ],
      "description": "Fiscal year of the funding.",
      "adoRef": "Custom.MFFiscalYear",
      "adoSuggested": false
    },
    {
      "key": "mstype",
      "name": "Milestone type",
      "kind": "select",
      "options": [
        "Contract",
        "Budget",
        "Go-live",
        "Regulatory",
        "Vendor",
        "Other"
      ],
      "appliesTo": [
        "milestone"
      ],
      "description": "What kind of commitment this milestone is.",
      "adoRef": "Custom.MFMilestoneType",
      "adoSuggested": false
    },
    {
      "key": "baseline",
      "name": "Baseline date",
      "kind": "date",
      "options": [],
      "appliesTo": [
        "milestone"
      ],
      "description": "The committed date.",
      "adoRef": "Custom.MFBaselineDate",
      "adoSuggested": false
    },
    {
      "key": "forecast",
      "name": "Forecast date",
      "kind": "date",
      "options": [],
      "appliesTo": [
        "milestone"
      ],
      "description": "Current 85% forecast.",
      "adoRef": "Custom.MFForecastDate",
      "adoSuggested": false
    },
    {
      "key": "actual",
      "name": "Actual date",
      "kind": "date",
      "options": [],
      "appliesTo": [
        "milestone"
      ],
      "description": "When the milestone was actually met.",
      "adoRef": "Custom.MFActualDate",
      "adoSuggested": false
    },
    {
      "key": "neededby",
      "name": "Needed by",
      "kind": "date",
      "options": [],
      "appliesTo": [
        "decision",
        "adr"
      ],
      "description": "Date the decision is needed to protect affected milestones.",
      "adoRef": "Custom.MFNeededBy",
      "adoSuggested": false
    },
    {
      "key": "outcome",
      "name": "Decision outcome",
      "kind": "textarea",
      "options": [],
      "appliesTo": [
        "decision",
        "adr"
      ],
      "description": "What was decided and why.",
      "adoRef": "Custom.MFDecisionOutcome",
      "adoSuggested": false
    },
    {
      "key": "reviewdue",
      "name": "Review due",
      "kind": "date",
      "options": [],
      "appliesTo": [
        "archreview"
      ],
      "description": "Service-level due date for the review, often 5 business days.",
      "adoRef": "Custom.MFReviewDue",
      "adoSuggested": false
    },
    {
      "key": "escalation",
      "name": "Escalation level",
      "kind": "select",
      "options": [
        "Team",
        "Coordination",
        "Portfolio"
      ],
      "appliesTo": [
        "impediment"
      ],
      "description": "Level that currently owns the impediment.",
      "adoRef": "Custom.MFEscalationLevel",
      "adoSuggested": false
    },
    {
      "key": "source",
      "name": "Improvement source",
      "kind": "select",
      "options": [
        "Retrospective",
        "Staff pulse",
        "Operating review",
        "Other"
      ],
      "appliesTo": [
        "improvement"
      ],
      "description": "Where the improvement came from.",
      "adoRef": "Custom.MFImprovementSource",
      "adoSuggested": false
    },
    {
      "key": "urgency",
      "name": "Urgency",
      "kind": "select",
      "options": [
        "Low",
        "Medium",
        "High"
      ],
      "appliesTo": [
        "discovery"
      ],
      "description": "Requester's urgency.",
      "adoRef": "Custom.MFUrgency",
      "adoSuggested": false
    },
    {
      "key": "process",
      "name": "Business process",
      "kind": "text",
      "options": [],
      "appliesTo": [
        "discovery"
      ],
      "description": "Business process affected by the request.",
      "adoRef": "Custom.MFBusinessProcess",
      "adoSuggested": false
    }
  ],
  "types": [
    {
      "key": "investment",
      "name": "Investment",
      "level": "3",
      "description": "A funded investment that work traces to.",
      "jira": {
        "name": "Investment",
        "builtIn": false,
        "workflow": "investment",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Investment",
        "systemRef": null,
        "backlog": "top",
        "color": "5646C8",
        "icon": "icon_crown",
        "states": [
          [
            "Candidate",
            "Proposed"
          ],
          [
            "Funded",
            "Proposed"
          ],
          [
            "Active",
            "InProgress"
          ],
          [
            "Closed",
            "Completed"
          ]
        ]
      }
    },
    {
      "key": "milestone",
      "name": "Milestone",
      "level": "3",
      "description": "A state the program must reach by a date. One register for every team.",
      "jira": {
        "name": "Milestone",
        "builtIn": false,
        "workflow": "milestone",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Milestone",
        "systemRef": null,
        "backlog": null,
        "color": "15203A",
        "icon": "icon_diamond",
        "states": [
          [
            "Planned",
            "Proposed"
          ],
          [
            "Forecast",
            "InProgress"
          ],
          [
            "At risk",
            "InProgress"
          ],
          [
            "Missed",
            "Resolved"
          ],
          [
            "Met",
            "Completed"
          ]
        ]
      }
    },
    {
      "key": "decision",
      "name": "Decision",
      "level": "3",
      "description": "A leadership decision tracked as work, with a needed-by date.",
      "jira": {
        "name": "Decision",
        "builtIn": false,
        "workflow": "decision",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Decision",
        "systemRef": null,
        "backlog": null,
        "color": "C77F00",
        "icon": "icon_gavel",
        "states": [
          [
            "Open",
            "Proposed"
          ],
          [
            "Proposed",
            "InProgress"
          ],
          [
            "Decided",
            "Completed"
          ],
          [
            "Superseded",
            "Removed"
          ]
        ]
      }
    },
    {
      "key": "discovery",
      "name": "Discovery item",
      "level": "2",
      "description": "A request being shaped before it becomes a feature.",
      "jira": {
        "name": "Discovery",
        "builtIn": false,
        "workflow": "discovery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Discovery",
        "systemRef": null,
        "backlog": "features",
        "color": "8E7CF0",
        "icon": "icon_clipboard",
        "states": [
          [
            "New",
            "Proposed"
          ],
          [
            "Shaping",
            "InProgress"
          ],
          [
            "Ready for delivery",
            "Completed"
          ],
          [
            "Declined",
            "Removed"
          ]
        ]
      }
    },
    {
      "key": "feature",
      "name": "Feature",
      "level": "2",
      "description": "Delivery-sized business value with a lane, a milestone link and an appetite.",
      "jira": {
        "name": "Epic",
        "builtIn": true,
        "workflow": "delivery",
        "hierarchy": "epic"
      },
      "ado": {
        "name": "Feature",
        "systemRef": "Microsoft.VSTS.WorkItemTypes.Feature",
        "backlog": "features",
        "color": null,
        "icon": null,
        "states": null
      }
    },
    {
      "key": "archreview",
      "name": "Architecture review",
      "level": "2",
      "description": "A review request with a service-level due date.",
      "jira": {
        "name": "Architecture Review",
        "builtIn": false,
        "workflow": "review",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Architecture review",
        "systemRef": null,
        "backlog": null,
        "color": "2D6CDF",
        "icon": "icon_review",
        "states": [
          [
            "Requested",
            "Proposed"
          ],
          [
            "In review",
            "InProgress"
          ],
          [
            "Changes needed",
            "Resolved"
          ],
          [
            "Approved",
            "Completed"
          ]
        ]
      }
    },
    {
      "key": "adr",
      "name": "Architecture decision record",
      "level": "2",
      "description": "A durable record of an architecture decision.",
      "jira": {
        "name": "Architecture Decision",
        "builtIn": false,
        "workflow": "decision",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Architecture decision",
        "systemRef": null,
        "backlog": null,
        "color": "1E5BB8",
        "icon": "icon_book",
        "states": [
          [
            "Open",
            "Proposed"
          ],
          [
            "Proposed",
            "InProgress"
          ],
          [
            "Decided",
            "Completed"
          ],
          [
            "Superseded",
            "Removed"
          ]
        ]
      }
    },
    {
      "key": "story",
      "name": "Story",
      "level": "1",
      "description": "Team-level work.",
      "jira": {
        "name": "Story",
        "builtIn": true,
        "workflow": "delivery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "User Story",
        "systemRef": "Microsoft.VSTS.WorkItemTypes.UserStory",
        "backlog": "stories",
        "color": null,
        "icon": null,
        "states": null
      }
    },
    {
      "key": "task",
      "name": "Task",
      "level": "1",
      "description": "Team-level task.",
      "jira": {
        "name": "Task",
        "builtIn": true,
        "workflow": "delivery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Task",
        "systemRef": "Microsoft.VSTS.WorkItemTypes.Task",
        "backlog": "tasks",
        "color": null,
        "icon": null,
        "states": null
      }
    },
    {
      "key": "bug",
      "name": "Bug",
      "level": "1",
      "description": "A defect.",
      "jira": {
        "name": "Bug",
        "builtIn": true,
        "workflow": "delivery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Bug",
        "systemRef": "Microsoft.VSTS.WorkItemTypes.Bug",
        "backlog": "stories",
        "color": null,
        "icon": null,
        "states": null
      }
    },
    {
      "key": "spike",
      "name": "Spike",
      "level": "1",
      "description": "Time-boxed research.",
      "jira": {
        "name": "Spike",
        "builtIn": false,
        "workflow": "delivery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Spike",
        "systemRef": null,
        "backlog": "stories",
        "color": "0F8F69",
        "icon": "icon_test_beaker",
        "states": null
      }
    },
    {
      "key": "impediment",
      "name": "Impediment",
      "level": "1",
      "description": "Something blocking work, with an escalation level.",
      "jira": {
        "name": "Impediment",
        "builtIn": false,
        "workflow": "impediment",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Impediment",
        "systemRef": null,
        "backlog": null,
        "color": "D63F55",
        "icon": "icon_traffic_cone",
        "states": [
          [
            "Open",
            "Proposed"
          ],
          [
            "Escalated",
            "InProgress"
          ],
          [
            "Resolved",
            "Completed"
          ]
        ]
      }
    },
    {
      "key": "improvement",
      "name": "Improvement item",
      "level": "All",
      "description": "An improvement to the way of working itself.",
      "jira": {
        "name": "Improvement",
        "builtIn": false,
        "workflow": "delivery",
        "hierarchy": "standard"
      },
      "ado": {
        "name": "Improvement",
        "systemRef": null,
        "backlog": null,
        "color": "586378",
        "icon": "icon_gear",
        "states": null
      }
    }
  ],
  "jiraWorkflows": {
    "delivery": {
      "name": "MF Delivery",
      "description": "Milestone Flow delivery workflow for features, stories, tasks, bugs, spikes and improvements.",
      "statuses": [
        [
          "Ready",
          "TODO"
        ],
        [
          "In Progress",
          "IN_PROGRESS"
        ],
        [
          "In Review",
          "IN_PROGRESS"
        ],
        [
          "Done",
          "DONE"
        ]
      ]
    },
    "milestone": {
      "name": "MF Milestone",
      "description": "Milestone Flow milestone register workflow.",
      "statuses": [
        [
          "Planned",
          "TODO"
        ],
        [
          "Forecast",
          "IN_PROGRESS"
        ],
        [
          "At Risk",
          "IN_PROGRESS"
        ],
        [
          "Met",
          "DONE"
        ],
        [
          "Missed",
          "DONE"
        ]
      ]
    },
    "decision": {
      "name": "MF Decision",
      "description": "Milestone Flow workflow for leadership decisions and architecture decision records.",
      "statuses": [
        [
          "Open",
          "TODO"
        ],
        [
          "Proposed",
          "IN_PROGRESS"
        ],
        [
          "Decided",
          "DONE"
        ],
        [
          "Superseded",
          "DONE"
        ]
      ]
    },
    "discovery": {
      "name": "MF Discovery",
      "description": "Milestone Flow product discovery workflow.",
      "statuses": [
        [
          "New",
          "TODO"
        ],
        [
          "Shaping",
          "IN_PROGRESS"
        ],
        [
          "Ready for Delivery",
          "DONE"
        ],
        [
          "Declined",
          "DONE"
        ]
      ]
    },
    "review": {
      "name": "MF Architecture Review",
      "description": "Milestone Flow architecture review queue workflow.",
      "statuses": [
        [
          "Requested",
          "TODO"
        ],
        [
          "In Review",
          "IN_PROGRESS"
        ],
        [
          "Approved",
          "DONE"
        ],
        [
          "Changes Needed",
          "DONE"
        ]
      ]
    },
    "investment": {
      "name": "MF Investment",
      "description": "Milestone Flow investment workflow.",
      "statuses": [
        [
          "Candidate",
          "TODO"
        ],
        [
          "Funded",
          "TODO"
        ],
        [
          "Active",
          "IN_PROGRESS"
        ],
        [
          "Closed",
          "DONE"
        ]
      ]
    },
    "impediment": {
      "name": "MF Impediment",
      "description": "Milestone Flow impediment escalation workflow.",
      "statuses": [
        [
          "Open",
          "TODO"
        ],
        [
          "Escalated",
          "IN_PROGRESS"
        ],
        [
          "Resolved",
          "DONE"
        ]
      ]
    }
  },
  "jiraLinks": [
    {
      "key": "milestone",
      "name": "Milestone",
      "outward": "serves milestone",
      "inward": "is served by"
    },
    {
      "key": "decision",
      "name": "Decision",
      "outward": "depends on decision",
      "inward": "is a decision for"
    },
    {
      "key": "review",
      "name": "Architecture review",
      "outward": "has architecture review",
      "inward": "reviews"
    }
  ],
  "adoSystemStateMap": [
    [
      "Ready",
      "New"
    ],
    [
      "In Progress",
      "Active"
    ],
    [
      "In Review",
      "Resolved"
    ],
    [
      "Done",
      "Closed"
    ]
  ],
  "filters": [
    {
      "name": "MF Milestone register",
      "description": "Every milestone with baseline and forecast.",
      "jql": "project = {P} AND issuetype = Milestone ORDER BY {F:forecast} ASC",
      "wiqlWhere": "[System.WorkItemType] = 'Milestone'",
      "wiqlOrder": "[Custom.MFForecastDate]"
    },
    {
      "name": "MF Milestones at risk",
      "description": "Milestones forecast past baseline or flagged at risk.",
      "jql": "project = {P} AND issuetype = Milestone AND status in (\"At Risk\", Missed) ORDER BY {F:forecast} ASC",
      "wiqlWhere": "[System.WorkItemType] = 'Milestone' AND [System.State] IN ('At risk', 'Missed')",
      "wiqlOrder": "[Custom.MFForecastDate]"
    },
    {
      "name": "MF Decisions due",
      "description": "Open leadership and architecture decisions by needed-by date.",
      "jql": "project = {P} AND issuetype in (Decision, \"Architecture Decision\") AND statusCategory != Done ORDER BY {F:neededby} ASC",
      "wiqlWhere": "[System.WorkItemType] IN ('Decision', 'Architecture decision') AND [System.State] IN ('Open', 'Proposed')",
      "wiqlOrder": "[Custom.MFNeededBy]"
    },
    {
      "name": "MF Architecture review queue",
      "description": "Open reviews, oldest due first.",
      "jql": "project = {P} AND issuetype = \"Architecture Review\" AND statusCategory != Done ORDER BY {F:reviewdue} ASC",
      "wiqlWhere": "[System.WorkItemType] = 'Architecture review' AND [System.State] IN ('Requested', 'In review')",
      "wiqlOrder": "[Custom.MFReviewDue]"
    },
    {
      "name": "MF Expedite lane",
      "description": "Everything in the expedite lane that isn't done.",
      "jql": "project = {P} AND {F:lane} = Expedite AND statusCategory != Done ORDER BY created ASC",
      "wiqlWhere": "[Custom.MFLane] = 'Expedite' AND [System.State] NOT IN ('Closed', 'Removed')",
      "wiqlOrder": "[System.CreatedDate]"
    },
    {
      "name": "MF Fixed date without a date",
      "description": "Fixed-date features missing a target date.",
      "jql": "project = {P} AND {F:lane} = \"Fixed date\" AND duedate is EMPTY AND statusCategory != Done",
      "wiqlWhere": "[System.WorkItemType] IN ('Feature', 'Epic') AND [Custom.MFLane] = 'Fixed date' AND [Microsoft.VSTS.Scheduling.TargetDate] = '' AND [System.State] NOT IN ('Closed', 'Removed')",
      "wiqlOrder": "[System.CreatedDate]"
    },
    {
      "name": "MF Aging work in progress",
      "description": "Team work in progress for more than 14 days.",
      "jql": "project = {P} AND issuetype in (Story, Task, Bug, Spike) AND statusCategory = \"In Progress\" AND status changed to \"In Progress\" before -14d ORDER BY updated ASC",
      "wiqlWhere": "[System.WorkItemType] IN ('User Story', 'Task', 'Bug', 'Spike') AND [System.State] = 'Active' AND [Microsoft.VSTS.Common.ActivatedDate] < @Today - 14",
      "wiqlOrder": "[Microsoft.VSTS.Common.ActivatedDate]"
    },
    {
      "name": "MF Open impediments",
      "description": "Impediments by escalation level.",
      "jql": "project = {P} AND issuetype = Impediment AND statusCategory != Done ORDER BY {F:escalation} DESC, created ASC",
      "wiqlWhere": "[System.WorkItemType] = 'Impediment' AND [System.State] IN ('Open', 'Escalated')",
      "wiqlOrder": "[System.CreatedDate]"
    },
    {
      "name": "MF Discovery pipeline",
      "description": "Requests being shaped.",
      "jql": "project = {P} AND issuetype = Discovery AND statusCategory != Done ORDER BY {F:urgency} DESC, created ASC",
      "wiqlWhere": "[System.WorkItemType] = 'Discovery' AND [System.State] IN ('New', 'Shaping')",
      "wiqlOrder": "[System.CreatedDate]"
    },
    {
      "name": "MF Delivery flow (board)",
      "description": "Board filter for delivery work.",
      "jql": "project = {P} AND issuetype in (Epic, Story, Task, Bug, Spike, Improvement) ORDER BY Rank ASC",
      "wiqlWhere": null,
      "wiqlOrder": null
    }
  ],
  "seed": {
    "transition": [
      {
        "id": "P1",
        "type": "feature",
        "title": "Phase 1: Align",
        "parent": null,
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Agree the direction, name an owner, start measuring today, and find the constraints you must respect. Typical length: 4 to 8 weeks.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [
          [
            "milestone",
            "G1"
          ],
          [
            "decision",
            "D1"
          ]
        ],
        "due": null
      },
      {
        "id": "P1.1",
        "type": "task",
        "title": "Name an executive sponsor and a transition lead",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.2",
        "type": "task",
        "title": "Write a one-page problem statement in your own organization's terms",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.3",
        "type": "task",
        "title": "Estimate current planning hours (attendees, event length, preparation)",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.4",
        "type": "task",
        "title": "Start collecting flow time and throughput from your work tracker",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.5",
        "type": "task",
        "title": "Find every policy, contract, audit or governance requirement that names a framework or its measures",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Governance and compliance. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-governance-compliance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.6",
        "type": "task",
        "title": "Map your real clocks: fiscal year and budget cycle, launches and seasonal peaks, regulatory and contract dates, vendor releases, blackout periods",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.7",
        "type": "task",
        "title": "Pick a cutover point: an increment boundary clear of major launches and tooling migrations",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.8",
        "type": "task",
        "title": "Brief leaders and staff: what is changing, what is not, and that no role cuts are assumed",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Training and communication. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-training-communication"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P1.9",
        "type": "task",
        "title": "Charter a small working group with a decision log",
        "parent": "P1",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 1: Align.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "G1",
        "type": "milestone",
        "title": "Gate: Direction endorsed",
        "parent": null,
        "fields": {
          "mstype": "Other"
        },
        "description": "The sponsor endorses the direction and the cutover target; the working group is chartered; baseline measures are collecting. Set the baseline date when the plan is agreed.",
        "labels": [
          "milestone-flow-transition",
          "gate"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2",
        "type": "feature",
        "title": "Phase 2: Design and build",
        "parent": null,
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Design cadences, lanes, roles, decision rights and the work-item model. Build it in your tools. Bring governance in early. Typical length: About one quarter.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [
          [
            "milestone",
            "G2"
          ]
        ],
        "due": null
      },
      {
        "id": "P2.1",
        "type": "task",
        "title": "Draft the operating model v1: levels, cadences, lanes, policies",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.2",
        "type": "task",
        "title": "Write decision rights: who decides what, at which level, by when",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.3",
        "type": "task",
        "title": "Design the work-item model and required fields",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Tooling and data. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-tooling-data"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.4",
        "type": "task",
        "title": "Build boards, the milestone register and dashboards in a test space",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Tooling and data. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-tooling-data"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.5",
        "type": "task",
        "title": "Check which features your tool's edition and hosting model support",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Tooling and data. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-tooling-data"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.6",
        "type": "task",
        "title": "Write role guides: what each role starts, keeps and stops",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Roles and people. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-roles-people"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.7",
        "type": "task",
        "title": "Walk governance through the new approach and the measures they will receive",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Governance and compliance. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-governance-compliance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.8",
        "type": "task",
        "title": "Publish a training plan by role and a communication calendar",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Training and communication. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-training-communication"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.9",
        "type": "task",
        "title": "Choose two pilot teams with different kinds of work",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P2.10",
        "type": "task",
        "title": "Agree metric definitions and confirm metrics are team-level only",
        "parent": "P2",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 2: Design and build.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "G2",
        "type": "milestone",
        "title": "Gate: Design approved",
        "parent": null,
        "fields": {
          "mstype": "Other"
        },
        "description": "Operating model v1, work-item model and dashboards approved; governance has reviewed the approach; training plan ready. Set the baseline date when the plan is agreed.",
        "labels": [
          "milestone-flow-transition",
          "gate"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3",
        "type": "feature",
        "title": "Phase 3: Prove",
        "parent": null,
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Pilot flow with a few teams while everyone else keeps the current cadence. Shorten the existing planning event. Rehearse the first quarterly review. Typical length: About one quarter.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [
          [
            "milestone",
            "G3"
          ],
          [
            "decision",
            "D2"
          ]
        ],
        "due": null
      },
      {
        "id": "P3.1",
        "type": "task",
        "title": "Run pilot teams on flow boards with WIP limits and lanes",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.2",
        "type": "task",
        "title": "Hold monthly replenishment for the pilot platforms",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.3",
        "type": "task",
        "title": "Make architecture reviews and leadership decisions work items for the pilots",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.4",
        "type": "task",
        "title": "Publish the first Monte Carlo forecasts and check them against actuals",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.5",
        "type": "task",
        "title": "Shorten the current planning event and drop its least useful sessions",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.6",
        "type": "task",
        "title": "Train every role before cutover; hold office hours",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Training and communication. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-training-communication"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.7",
        "type": "task",
        "title": "Rehearse the quarterly business review with real data",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.8",
        "type": "task",
        "title": "Report old and new measures side by side",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Governance and compliance. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-governance-compliance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P3.9",
        "type": "task",
        "title": "Decide go or no-go using pilot data and staff feedback",
        "parent": "P3",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 3: Prove.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "G3",
        "type": "milestone",
        "title": "Gate: Cutover go or no-go",
        "parent": null,
        "fields": {
          "mstype": "Other"
        },
        "description": "At least two months of pilot data; tools ready; most staff trained; no major launch or migration in progress. If not, move cutover one quarter. Set the baseline date when the plan is agreed.",
        "labels": [
          "milestone-flow-transition",
          "gate"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4",
        "type": "feature",
        "title": "Phase 4: Cut over",
        "parent": null,
        "fields": {
          "lane": "Fixed date"
        },
        "description": "The first quarterly business review replaces PI Planning. All teams move to flow. New measures go into status reports. Typical length: One quarter.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [
          [
            "milestone",
            "G4"
          ]
        ],
        "due": null
      },
      {
        "id": "P4.1",
        "type": "task",
        "title": "Hold the first half-day quarterly business review instead of PI Planning",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.2",
        "type": "task",
        "title": "Move all teams to flow boards; sprints remain a team choice",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Pilot and cutover. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-pilot-cutover"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.3",
        "type": "task",
        "title": "Run monthly replenishment for every platform",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.4",
        "type": "task",
        "title": "Hold the first monthly operating review",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.5",
        "type": "task",
        "title": "Add milestone health, flow and delivery measures to status reports",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.6",
        "type": "task",
        "title": "Switch role titles and responsibilities as the role guides describe",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Roles and people. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-roles-people"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.7",
        "type": "task",
        "title": "Retire increment-specific boards, fields and planning spaces",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Tooling and data. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-tooling-data"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P4.8",
        "type": "task",
        "title": "Collect a quick staff pulse at week six",
        "parent": "P4",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Training and communication. Phase 4: Cut over.",
        "labels": [
          "milestone-flow-transition",
          "ws-training-communication"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "G4",
        "type": "milestone",
        "title": "Gate: 90-day review",
        "parent": null,
        "fields": {
          "mstype": "Other"
        },
        "description": "Planning hours, flow time, milestone health and staff pulse reviewed against the baseline; version 2 changes agreed. Set the baseline date when the plan is agreed.",
        "labels": [
          "milestone-flow-transition",
          "gate"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5",
        "type": "feature",
        "title": "Phase 5: Stabilize and evolve",
        "parent": null,
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Tune the model with data, tie next year's roadmap to the budget cycle, and wind down the enabling team. Typical length: Ongoing.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.1",
        "type": "task",
        "title": "Retire the old predictability measure after one quarter of parallel reporting",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.2",
        "type": "task",
        "title": "Build next year's roadmap with the budget cycle",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.3",
        "type": "task",
        "title": "Adjust lane shares and WIP limits from real data",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Operating model. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-operating-model"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.4",
        "type": "task",
        "title": "Hand coaching to delivery leads and wind down the enabling team",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Roles and people. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-roles-people"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.5",
        "type": "task",
        "title": "Invite neighboring teams or programs to the quarterly review",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Leadership and governance. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-leadership-governance"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "P5.6",
        "type": "task",
        "title": "Publish a before-and-after summary",
        "parent": "P5",
        "fields": {
          "lane": "Fixed date"
        },
        "description": "Workstream: Measurement. Phase 5: Stabilize and evolve.",
        "labels": [
          "milestone-flow-transition",
          "ws-measurement"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "D1",
        "type": "decision",
        "title": "Endorse the move to Milestone Flow and the cutover target",
        "parent": null,
        "fields": {},
        "description": "Options: endorse, endorse with changes, or not now. Affects gate: Direction endorsed.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "D2",
        "type": "decision",
        "title": "Cutover go or no-go",
        "parent": null,
        "fields": {},
        "description": "Decide using pilot data, tool readiness, training completion and go-live status. If no-go, keep the current cadence one more quarter.",
        "labels": [
          "milestone-flow-transition"
        ],
        "links": [],
        "due": null
      }
    ],
    "sample": [
      {
        "id": "M1",
        "type": "milestone",
        "title": "Release 2 go-live",
        "parent": null,
        "fields": {
          "mstype": "Go-live",
          "baseline": "2027-04-15",
          "forecast": "2027-04-29"
        },
        "description": "Forecast moved two weeks after a vendor patch delay. A lane-split decision is open.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "M2",
        "type": "milestone",
        "title": "Next fiscal year budget request submitted",
        "parent": null,
        "fields": {
          "mstype": "Budget",
          "baseline": "2027-02-24",
          "forecast": "2027-02-24"
        },
        "description": "Roadmap outcomes and funding lines due to the budget office.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "M3",
        "type": "milestone",
        "title": "Vendor update window",
        "parent": null,
        "fields": {
          "mstype": "Vendor",
          "baseline": "2027-05-20",
          "forecast": "2027-05-20"
        },
        "description": "Regression suite must be automated before the window opens.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "I1",
        "type": "investment",
        "title": "Platform modernization (example)",
        "parent": null,
        "fields": {
          "platform": "Platform 1",
          "funding": "Line 1",
          "fiscal": "FY27"
        },
        "description": "Example investment. Replace with your funded lines.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "F1",
        "type": "feature",
        "title": "Vendor update readiness",
        "parent": "I1",
        "fields": {
          "lane": "Fixed date",
          "platform": "Platform 1",
          "funding": "Line 1"
        },
        "description": "Be ready to take the vendor update inside its window.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [
          [
            "milestone",
            "M3"
          ]
        ],
        "due": "2027-05-13"
      },
      {
        "id": "S1",
        "type": "story",
        "title": "Automate regression for the top 20 business processes",
        "parent": "F1",
        "fields": {
          "lane": "Fixed date",
          "platform": "Platform 1"
        },
        "description": "",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "S2",
        "type": "story",
        "title": "Dry-run the update in the test environment",
        "parent": "F1",
        "fields": {
          "lane": "Fixed date",
          "platform": "Platform 1"
        },
        "description": "",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "F2",
        "type": "feature",
        "title": "Supplier onboarding workflow",
        "parent": "I1",
        "fields": {
          "lane": "Standard",
          "platform": "Platform 2",
          "appetite": "6 weeks"
        },
        "description": "Shape and deliver a guided supplier onboarding workflow.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [
          [
            "decision",
            "D1"
          ],
          [
            "review",
            "R1"
          ],
          [
            "milestone",
            "M1"
          ]
        ],
        "due": null
      },
      {
        "id": "S3",
        "type": "story",
        "title": "Capture supplier details with validation",
        "parent": "F2",
        "fields": {
          "lane": "Standard",
          "platform": "Platform 2"
        },
        "description": "",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "S4",
        "type": "story",
        "title": "Route new suppliers for approval",
        "parent": "F2",
        "fields": {
          "lane": "Standard",
          "platform": "Platform 2"
        },
        "description": "",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "F3",
        "type": "feature",
        "title": "Retire legacy reporting customizations",
        "parent": "I1",
        "fields": {
          "lane": "Investment",
          "platform": "Platform 1",
          "appetite": "6 weeks"
        },
        "description": "Runway work: replace custom reports with standard analytics views.",
        "labels": [
          "milestone-flow-sample",
          "runway"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "S5",
        "type": "spike",
        "title": "Inventory reporting customizations and their users",
        "parent": "F3",
        "fields": {
          "lane": "Investment",
          "platform": "Platform 1"
        },
        "description": "Time-boxed to three days.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "B1",
        "type": "bug",
        "title": "Approval email not sent when approver is on leave",
        "parent": null,
        "fields": {
          "lane": "Expedite",
          "platform": "Platform 2"
        },
        "description": "Example expedite item.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "D1",
        "type": "decision",
        "title": "Approve the lane split for next quarter",
        "parent": null,
        "fields": {
          "neededby": "2027-03-26"
        },
        "description": "Options: keep 5/30/50/15, or shift 10 points from standard to fixed date for the go-live.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "A1",
        "type": "adr",
        "title": "Use standard analytics views instead of custom reports",
        "parent": null,
        "fields": {
          "neededby": "2027-03-12"
        },
        "description": "Context, options, decision and consequences.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "R1",
        "type": "archreview",
        "title": "Review supplier onboarding integration design",
        "parent": null,
        "fields": {
          "reviewdue": "2027-03-05"
        },
        "description": "Requested by the platform lead for F2.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "Q1",
        "type": "discovery",
        "title": "Request: automated supplier risk scoring",
        "parent": null,
        "fields": {
          "urgency": "Medium",
          "platform": "Platform 2",
          "process": "Supplier management",
          "appetite": "2 weeks"
        },
        "description": "Requester wants risk scores on new suppliers.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "X1",
        "type": "impediment",
        "title": "Test environment refresh is blocked",
        "parent": null,
        "fields": {
          "escalation": "Coordination"
        },
        "description": "Blocks S2. Needs a decision on refresh timing.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      },
      {
        "id": "U1",
        "type": "improvement",
        "title": "Shorten the weekly flow sync agenda",
        "parent": null,
        "fields": {
          "source": "Retrospective",
          "lane": "Investment"
        },
        "description": "Drop the status round; walk the board from the right.",
        "labels": [
          "milestone-flow-sample"
        ],
        "links": [],
        "due": null
      }
    ]
  }
}